CHEE 4703: Process Dynamics and Control Fall 2024 
 
Lab 3: Root Locus Diagram and Controller Tuning 
Process Background 
Consider a blending process with two inlet streams and a single (overflow) outlet stream. The 
schematic diagram of the process is shown in Figure 1, where x1, x2 and x represent the mass 
fraction of component A and w1, w2 and w represents the overall mass flow rate. One of the inlet 
streams, stream 1, is made up of compound A (and the balance compound B). The mass fraction 
of A is a disturbance variable and has a steady state value of 20% (with a total steady state flow 
rate of 1 kg/min). The other inlet stream, stream 2, is made up of pure B, where the flow rate is a 
manipulated variable. The outlet mass fraction of A is a controlled variable with a target of 10%. 
Assume that there is 10 kg of liquid in the tank (constant volume with a density similar to water). 
 
Figure 1. A blending process in a CSTR. 
Process Parameters 
The process operating conditions are as follows: 
Constants Input Steady State Conditions 
V 10 L   ̅̅̅1̅ 1 kg/s 
ρ 1 kg/L   ̅̅1̅ 0.2 
x2 0   ̅̅̅2̅ 1 kg/s 
Output Steady State Condition 
  ̅ 0.1 
 CHEE 4703: Process Dynamics and Control Fall 2024 
 
Kathy Isaac, Stanislav Sokolenko Page 2 of 7 
 
From Example 10 in Topic 2, the process, Gp, and disturbance, Gd, transfer functions are: 
 
The process is controlled by a PI controller, Gc. Model the actuator, Gv, with a variable delay, a, 
and assume all other transfer functions are unity (Gm = Gs = 1). 
 (1/1 𝑃𝑎𝑑é 𝑎𝑝𝑝𝑟𝑜𝑥𝑖𝑚𝑎𝑡𝑖𝑜𝑛) 
 
Figure 2. General representation of a closed loop process. 
Objectives 
1. Determine the critical controller parameters using a root locus plot. 
2. Evaluate the effect of delay on stability and critical controller parameter using root locus plots. 
3. Apply the direct synthesis controller tuning method to the process and evaluate the response 
to disturbance rejection. 
 
 CHEE 4703: Process Dynamics and Control Fall 2024 
 
Kathy Isaac, Stanislav Sokolenko Page 3 of 7 
 
Controller Setup 
1. Implement a closed loop PI controller in Simulink to control the outlet mass fraction of 
component A by controlling the flow rate of stream 2 as illustrated in Figure 2. 
• Use Transfer Fcn blocks to implement the process, Gp, disturbance, Gd, and the actuator, 
Gv. 
• Refer to Prelab 2 to set up the appropriate controller in a closed loop process. 
• Use Setpoint blocks for the setpoint and disturbance inputs and set the setpoint equal to a 
constant value of 0 and the disturbance input to a constant value of 0.1. 
Root Locus Diagram 
2. Add a Pole-Zero Plot block and set the Disturbance input signal as the Input Perturbation and 
the Process output signal as the Output Measurement. See the example provided at the end of 
this document for an example on setting up the root locus plot. 
 
Questions 
1. For the closed loop process with a PI controller with a delay of 1 s, set Kc = 1 and find the 
critical τI. Make plots of the poles and zeros showing the transition from stable to unstable at 
the critical τI. Include 3 plots: stable, critical and unstable. Repeat for delays of 3 and 5 s. Note: 
Set the Setpoint block constant at 0 and the Disturbance Step block constant at 0.1 
a. How does the critical τI change with increase in delay? 
2. For the closed loop process with a PI controller with a delay of 1 s, set τI = 10 and find the 
critical Kc. Make a plot of the poles and zeros showing the transition from stable to unstable at 
the critical Kc. Include 3 plots: stable, critical and unstable. Repeat for delays of 3 and 5 s. 
Note: Set the Setpoint block constant at 0 and the Disturbance Step block constant at 0.1 
a. How does the critical Kc change with increase in delay? CHEE 4703: Process Dynamics and Control Fall 2024 
 
Kathy Isaac, Stanislav Sokolenko Page 4 of 7 
 
3. When there is no delay in the actuator, tune the PI controller using the direct synthesis method 
and evaluate the response to a step change of 0.1 in the disturbance variable to different values 
of τc between 10 and 100. Note: set the initial value of the disturbance input to 0 and the final 
value to 0.1. 
a. How does τc affect the process response? 
b. What τc should be chosen if the process must reject a step disturbance of 0.1 in under 
60 seconds with no large oscillations. 
Report Guidelines 
1. Use the lab report template provided. 
2. The report must seek to concisely answer the questions in the previous section. 
3. The text of the report body must be within 1 page. It is recommended to use a 12-point font, 
1.5 spaced but please use 11-point font, single spaced at a minimum. 
4. Do not break up the text. Add all the text to page 1 and refer to figures and tables on subsequent 
pages to aid your discussion. 
5. Include a screenshot of your complete Simulink model for the PI controller set up in Question1.

Pole-Zero Plot Example for the Heating Tank Process 
1. Set up the closed loop for the given process and controller. Set the Setpoint block constant at 
0 and the Disturbance Step block constant at 1. 
 CHEE 4703: Process Dynamics and Control Fall 2024 
 
Kathy Isaac, Stanislav Sokolenko Page 5 of 7 
 
2. Add a Pole-Zero Plot block to the workspace 
 
3. Double click on the Pole-Zero Plot block and click on the + symbol to add inputs and outputs 
 
4. Click on the disturbance signal (highlighted in blue) and press the << symbol to add the 
selected signal. Repeat for the Output signal. CHEE 4703: Process Dynamics and Control Fall 2024 
 
Kathy Isaac, Stanislav Sokolenko Page 6 of 7 
 
 
5. Once added, change the Configuration of the input signal to Input Perturbation and the 
output to Output Measurement and click Apply. Change the snapshot time to 1. 
 
6. Click on Show Plot 
 CHEE 4703: Process Dynamics and Control Fall 2024 
 
Kathy Isaac, Stanislav Sokolenko Page 7 of 7 
 
7. Click on the green Run button to display the poles and zeros. Poles are represented by x and 
zeros by o. Click on them to see their exact values 
 
8. Change controller parameters and assess how the poles and zeros change. 
 
请加QQ:99515681  邮箱:99515681@qq.com   WX:codinghelp





 

扫一扫在手机打开当前页
  • 上一篇:ESTR1002代做、代写C/C++设计编程
  • 下一篇:&#160;COMP338编程代做、代写Python程序语言
  • 无相关信息
    合肥生活资讯

    合肥图文信息
    新能源捕鱼一体电鱼竿好用吗
    新能源捕鱼一体电鱼竿好用吗
    海信罗马假日洗衣机亮相AWE  复古美学与现代科技完美结合
    海信罗马假日洗衣机亮相AWE 复古美学与现代
    合肥机场巴士4号线
    合肥机场巴士4号线
    合肥机场巴士3号线
    合肥机场巴士3号线
    合肥机场巴士2号线
    合肥机场巴士2号线
    合肥机场巴士1号线
    合肥机场巴士1号线
    合肥轨道交通线路图
    合肥轨道交通线路图
    合肥地铁5号线 运营时刻表
    合肥地铁5号线 运营时刻表
  • 币安app官网下载 短信验证码

    关于我们 | 打赏支持 | 广告服务 | 联系我们 | 网站地图 | 免责声明 | 帮助中心 | 友情链接 |

    Copyright © 2024 hfw.cc Inc. All Rights Reserved. 合肥网 版权所有
    ICP备06013414号-3 公安备 42010502001045